Treatment MeasuresLitter Traps : Costs Checklist
More Information
Life cycle costs checklist
Use the checklist form below as a guide to assessing the life cycle costs of litter traps.
| INSTALLATION | |||
|---|---|---|---|
| Does the trap satisfy: | YES | NO | |
| - the design flow rate | |||
| - the available space constraints | |||
| - hydraulic and flooding issues | |||
| - other concerns (safety, aesthetics, etc.) | |||
| if any of the above questions were NO then go no further with that trap. | |||
| Trap cost | $ _____________ | ||
| Installation costs (if not include in supply) | $ _____________ | ||
| Other costs (rock excavation, lid loading, access road for maintenance etc.) | $ _____________ | ||
| TOTAL INSTALLATION COSTS | $ _____________ | ||
| MAINTENANCE | |||
| YES | NO | ||
| Is a maintenance contract included in the proposal? | |||
| If YES… | What is the annual maintenance cost? | $ _____________ | |
| What are the expected costs of disposal? | $ _____________ | ||
| TOTAL MAINTENANCE COSTS | $ _____________ | ||
|
|
|||
| IF NO… | Cost of special maintenance equipment (cranes, trucks, pumps etc.) | $ _____________ | |
| Cost of maintenance (including frequency, time, crew etc.) | $ _____________ | ||
| Estimated disposal costs (regard to expected loads and material type) | $ _____________ | ||
| Safety requirements (safety equipment hire, additional site equipment) | $ _____________ | ||
| TOTAL MAINTENANCE COSTS | $ _____________ | ||
| EQUIVALENT ANNUAL COST | |||
|
Life cycle costs =
Installation costs + (n x Maintenance costs)
n
(Where n = project duration (years) |
|||